The Hoover Dam, P2 – 5.12b


32m / 105ft, 9 bolts

Description:

Equipped in 1986 by Andy Genereux, this route continues on bolts from the P1 anchors to the very top of the dam. As awesome as linking from the first pitch would be, the rope drag is somethin' fierce and the stretch will make for some large whips / tiring jugging.

Currently an open project. Feels sandy! Contact Matt if you want a belay.

20m, 6 bolts (including anchors). Retrofitted with stainless hardware in 2020.